Mexico City's New Trolebús Line 12 Inaugurated by Governor Martí Batres Guadarrama

Mexico City's Governor inaugurates Trolebús Line 12, replacing 107 diesel buses with 28 electric trolebuses, improving air quality and reducing carbon emissions. The new line serves 30,000 users, primarily in the Pedregales area of Coyoacán, with 19 stations and 29 platforms.

author-image
Nitish Verma
New Update
Mexico City's New Trolebús Line 12 Inaugurated by Governor Martí Batres Guadarrama

Mexico City's New Trolebús Line 12 Inaugurated by Governor Martí Batres Guadarrama

Governor Martí Batres Guadarrama inaugurated Mexico City's new Trolebús Line 12 on June 4, 2024, marking a significant step in the city's efforts to modernize its public transportation system. This new line will operate along Avenida Aztecas in Coyoacán, replacing 107 diesel buses with 28 electric trolebuses.

The new line, which serves approximately 30,000 users, primarily benefits residents of the Pedregales area in Coyoacán. The project required an investment of 240 million pesos and stretches 14.6 kilometers in both directions, featuring 19 stations and 29 platforms equipped with stainless steel parabuses and universal accessibility ramps.

Why this matters: This new transportation initiative has significant implications for the environment and the daily lives of Mexico City's residents. The reduction in carbon emissions and improved air quality will have a positive impact on the city's overall health and sustainability.

The infrastructure upgrades for the new line are extensive. Over 3,200 square meters of hydraulic concrete and 5,700 square meters of sidewalks have been replaced. Secure crossings were installed, and the area saw the planting of 60 trees and over 2,000 ornamental plants and shrubs. Additionally, 1,100 luminaires were installed, tripling the previous level of lighting, along with 15 security cameras and six emergency buttons.

The new Trolebús Line 12 is not only a significant upgrade in terms of infrastructure but also an environmentally friendly initiative. The 28 electric trolebuses are expected to reduce carbon emissions by 1,700 tons annually, contributing to improved air quality in Mexico City. The line will replace routes 1 and 13, with the old buses being gradually phased out over the next few days.

Governor Batres expressed his appreciation during the inauguration, stating, *"Many thanks for accompanying us in this formal opening of the Aztecas Trolebús Line. This trolebús line is dedicated with all affection to the inhabitants of Pedregales in Coyoacán."*

The new route is strategically important, connecting with Line 2 of the Metro, Lines 1 and 7 of the Trolebús, and Line 1 of the Metrobús. This makes it a vital axis for integrating different modes of mobility in the city. The route will also connect with the Tren Ligero.

Secretary of Mobility Andrés Lajous highlighted the environmental benefits, stating, "Con el Trolebús de Av. Aztecas se sustituyen 107 microbuses y camiones diésel por 28 trolebuses de última generación."

The new Trolebús Line 12 is expected to significantly improve travel times and comfort for the residents of Los Pedregales. The project is anticipated to reduce travel time by 20%, benefiting 115,000 inhabitants. Each trolebús will arrive every three minutes at the 17 stops and two terminals, ensuring efficient and timely service.

The new Trolebús Line 12 represents a major advancement in Mexico City's public transportation system, combining modern infrastructure with environmental sustainability. The city's ongoing development sees this project set a precedent for future transportation initiatives.

Key Takeaways

  • Mexico City's new Trolebús Line 12 inaugurated on June 4, 2024.
  • 28 electric trolebuses replace 107 diesel buses, reducing carbon emissions.
  • The 14.6km line serves 30,000 users, primarily in Pedregales, Coyoacán.
  • The project invested 240 million pesos, featuring 19 stations and universal accessibility.
  • The new line reduces travel time by 20%, benefiting 115,000 inhabitants.